The co-location rack cabinet system from Hammond features four (4) different bay configurations and several roof options. Whether you are leasing the space or want to restrict access to sections of your cabinet, the Hammond CLC Series is loaded with innovative features.
Features
- Available in 44U mounting height.
- Available in 36", 42" and 48" depths.
- One single frame allows multiple bay configurations.
- Compatible with containment system and cable-trough accessories.
- Flush-mounted doors with locking swing handle.
- Side cable pass-thru knockouts.
- Optional solid side panels.
- Optional interchangeable top panels.
- CLC top panels that include an opening are compatible with:
- C2T1923** C2 Top Panel
- CLCH Passive Air Chimney
Specifications
- Cabinet frame constructed in 14-gauge mild steel with 12-gauge mild steel reinforced corner brackets.
- Cabinet doors and side panels constructed in 16-gauge mild steel.
- Square hole 19" mounting rails are constructed in 12-gauge mild steel and include rack unit indicators.
- Where applicable, the divider shelves are constructed of reinforced 16-gauge steel.
- The shelves are designed to support the most robust of equipment such as tower servers.
- UL Listed 2416 load rated for up to 3,000 lbs (1,360 kg). Static Load tested to 12,000 lbs (5,443 kg).
- Grounding studs bonded to frame, side panels and doors. Front and rear studs on cabinet frame conform to PET.
- Finished in textured RAL9005 black powder paint.
- TAA-compliant for GSA Schedule purchases.
- RoHS Compliant.
- Manufactured in North America within an ISO 9001:2015 certified facility.
PCI DSS Compliance
The CLC series is PCI-Compliant when:
- Multiple cabinets are connected together and/or the open side is closed in using the appropriate side panel (listed in the accessory table below).
- The cable manager security plates CLCCMSP are installed.
- The cable manager security covers CLCCMSC are installed.
Included Components
Note: Cabinet TOP panels are NOT included and are sold separately. (See table below)
1. Samples Leading Time ?
Mould items ( casting & injection plastic):15-20 days
sheet plate : 5 days
CNC maching : 3-5 days
Welding : 2 days
Mould cost : 100% prepaid and free samples for quality confirmation ,free
2. Shipment terms :
FOB QINGDAO /SHANGHAI /Tianjin CIF , C&F
3. Payment terms :
Mini order :100% preapid if less than $3000;15 working days for delivery.
Beverage bottle, cosmetic bottle, medicine bottle, jar etc.
Mass Order : 30% prepaid and balance cleared before delivery or at sight of OBL ;20 -30 working days based on order quantity.
4. Whether inspection to keep the quality ?
1.Accessories Samples inspeciton;
2.Finished samples inspeciton ;
3.First article inspection ;
4.Rounting inspeciton ;
5.spot inspection ;
6.100% inspection if requested .
5. Any World famous customers as a quality reference ?
1. Railway vehicles
|
CRRC (China )
|
4. Heater
|
Media (China)
|
2. Motocycles
|
Suzuki( Japan )
|
5. Generators
|
Digatron (Germany)
|
3. Communication
|
Skyware Global (USA)
|
6. Leisure Massage Couch
|
Earthlite (USA)
|